See the price list above — [$3000] for a 3-room flat. A site survey confirms the figure. Older flats with multiple tile layers over screed take longer and cost more; we tell you that at the survey, not on the invoice.
Yes. Hacking floor finishes requires a permit, as does hacking internal wall finishes and demolishing any internal wall. Laying vinyl or carpet over existing finishes does not. We submit the application for you — you cannot apply directly.
Not within three years of the block’s completion. HDB restricts removal of bathroom and toilet wall and floor finishes during that period, because hacking the tiles breaches the waterproofing membrane under the screed. You can overlay the existing tiles instead. After three years, hacking is permitted with a permit and proper waterproofing reinstatement.
No, and neither can anyone else. HDB restricts noisy renovation — which includes all hacking — to 9am–5pm on weekdays only. General non-noisy renovation is allowed until 6pm on weekdays and Saturdays. We plan the schedule around the real hours and tell you the honest day count.
Sometimes. Non-load-bearing walls can usually go, with a permit. Load-bearing walls, household shelter walls, external walls and AC ledge walls cannot, ever. If it is a reinforced concrete element, you will need a permit and a Professional Engineer to supervise. We identify which you have at the survey — the answer is not reliably visible from a floor plan.
Yes, up to 3 lorry trips for a whole-unit job. Beyond that, it is clear by us per additional trip, stated on your quotation before work starts. We price it as a separate visible line precisely so it cannot become a surprise.
Possibly, and it is worth knowing the rule. An asbestos survey is legally required for building work in any building completed before 1 January 1991 — that includes renovation of a home, not just commercial demolition. If asbestos-containing material is found, only an MOM-approved asbestos-removal contractor may remove it. We flag this at the survey rather than discovering it mid-job.
Typically depends on site conditions, work lead time, and working days for a 3- to 4-room flat, longer for larger units or where screed and multiple tile layers are involved. Add up to three weeks beforehand for the HDB permit.
Yes. The process differs — MCST approval instead of an HDB permit, plus lift protection and booking, possibly tighter working hours, and a PE certification that no structural works are involved. Condo jobs cost more than the equivalent HDB job because of access and haulage, and we say so at quotation.
We quote it separately. Hacking, patching, screeding, tiling and painting are different trades and lumping them into one number is how quotations become unreadable. Ask and we will price both.